The Build: The Aurelia Villa from empty plot to completed home

Preparing the site

Everything starts somewhere.

Stage 00 / 09 · 0%

Empty Plot

A surveyed plot with pegged boundaries, untouched ground and the landscape we design around: sun path, views and the street edge.

A-09Stages of construction

Ten stages, one house.

The model above is not a set of pictures. It is one building made of more than a thousand independent elements: footings, columns, slabs, brick courses, frames, cladding panels, furniture and trees, each arriving in its real construction order.

  1. 000%

    Empty Plot

    A surveyed plot with pegged boundaries, untouched ground and the landscape we design around: sun path, views and the street edge.

    Plot boundarySurvey pegsNatural groundSite context
  2. 018%

    Site Preparation

    Vegetation is cleared, the ground is levelled and set out, and excavation opens up the footprint while the site cabin and tower crane arrive.

    Land clearingLevellingExcavationSetting-out linesTower crane
  3. 0215%

    Foundation

    Reinforcement cages go into the excavation, isolated footings and pedestals are cast, plinth beams tie them together and the plinth slab is poured.

    ReinforcementFootingsPedestalsPlinth beamsBackfillPlinth slab
  4. 0330%

    Structural Framework

    RCC columns rise storey by storey, beams span between them and floor slabs are cast, cantilevers and all. The staircase is formed in concrete.

    RCC columnsBeamsFloor slabsRoof slabStaircaseScaffolding
  5. 0445%

    Brickwork & Walls

    Masonry infill rises between the columns, leaving the openings for every door and window, while internal partitions divide the plan into rooms.

    External wallsInternal partitionsDoor openingsWindow openingsParapets
  6. 0560%

    Roof & Windows

    Roof plates and finishes are laid, glazing and frames are installed, doors are hung and glass balustrades line every terrace.

    Roof structureRoofingGlazingDoorsBalcony railings
  7. 0675%

    Exterior Finishing

    Lime plaster, natural stone and cedar cladding are applied over the masonry, reveals are lined and the architectural lighting is fixed.

    PlasterStone claddingTimber claddingWindow revealsFacade lighting
  8. 0788%

    Interior Design

    Oak, marble and terrazzo floors go down, ceilings and walls are finished, then the kitchen, bathrooms, furniture and lighting move in.

    FlooringCeilingsKitchenBedroomsBathroomsFurnitureLighting
  9. 0895%

    Landscaping

    Lawns, planting beds, mature trees, the pool and its deck, the driveway, stone paths, boundary walls and garden lighting complete the plot.

    LawnTrees & plantingPoolDeckDrivewayPathwaysBoundary wallsGarden lights
  10. 09100%

    Completed Home

    The scaffolding is long gone. Golden light, reflections in the pool and every room lived-in: the residence, handed over.

    HandoverGolden hourInterior stylingOutdoor living

Construction durations and methods are illustrative; real sequences depend on site, structure and local regulations.